Brand Logo Request swatch support

Procurement services

Supplier and sample handoffs for coated fabric — Serge Ferrari

  1. Brief
  2. Swatch
  3. Bulk

The desk matches suppliers and lines up documents. It does not coat cloth and it does not hold a mill certificate in its own name.

Coated fabric handoff folder with swatch and width note

Supplier and sample handoffs

A coated fabric purchase fails in the gaps between people: the buyer who approves shade, the mill that coats the lot, and the forwarder who needs a packing list that matches the roll count. This page sets those handoffs for PVC, PU, PTFE, silicone and related coated constructions. Commercial numbers stay blank until a supplier writes them against the article.

List the coated-fabric weight and weld method approvals in the order they happen

Start with the object, not a brand nickname. A buyer who says “coated polyester” still has to choose PVC, PU, acrylic or silicone, then state GSM, usable width and finish. For an 18 oz vinyl coated polyester cover, write whether 18 oz is the target class and ask the mill to return actual g/m² plus tolerance. Sequence the approvals so the lab dip is accepted before bulk color is released, and so a change in coating weight opens a new version instead of overwriting the old card.

Deliverables from the desk are a normalized brief, a comparison of quotations and a list of missing documents. Deliverables from the supplier are the article confirmation, the sample and any test report whose method, date and lot are readable. MOQ, lead time and Incoterm are copied from that supplier reply. They are not filled with a house standard.

Track each coated-fabric weight and weld method revision against the signed reference

Coated fabric quotes often hide a substitution: a lighter scrim, a one-side coat instead of two, or a laminate offered where the brief asked for a coating. Coating and lamination are different builds. Adhesion, peel and vapor movement are judged with the method the buyer names, not with a slogan. When a mill cannot hit the usable width, the exception is written in the comparison so a cheaper roll is not treated as equal yield.

Each swatch revision keeps the previous code. If revision B changes plasticizer, topcoat or shade, bulk cannot ship against revision A. The buyer signs the current card. The desk files the exception and does not decide the engineering trade-off. Stock color may shorten development, while a custom lab dip may be required for a shade band the stock lot cannot meet. Availability of either path is confirmed on that inquiry.

Put inspection of coated-fabric weight and weld method and export papers on the order

Before rolls move, name who inspects. Four-point inspection, if used, needs a defect map the buyer accepts. Coating adhesion, hydrolysis, colorfastness or hydrostatic pressure, if required, names the method, the sample condition and the lot. A report on a different substrate is logged as not applicable. The supplier remains responsible for what the report covers. This desk coordinates the request and the reading of the scope.

Export handover is document coordination: commercial invoice, packing list, roll lengths and the destination the buyer stated. Consolidation is arranged only for the lots already approved. Payment terms and who books freight are explicit on the quote. No phone, street address or mailbox is published here because none has been supplied for this desk. Use the inquiry form to place the specification.

Hand the coated fabric brief to the comparison desk

Include the current swatch code, the width basis and the inspection items still open.

Send a fabric brief